|
Parallel Operation of Distributed Generation in Weak Distribution Systems
| [View]
[Download]
|
Author(s) |
Fainan Magueed, Jaap Daalder |
Abstract |
The main aim of connecting distributed
generation (DG) to the distribution network is to increase
the power capacity to meet an increased demand. In case of
implementing DGs with a power electronics interface, more
functions can be added simply by modifying the control
targets. DGs can enhance the voltage reliability by
regulating the voltage level at critical load connection points
in weak grids. To this end, parallel operation of DGs in
weak grids is discussed with respect to the input power
limitation of a DG, the power angle at the connection bus,
and the voltage profile of the feeder. |
Download |
Filename: | T11-103.pdf |
Filesize: | 1.16 MB |
|
Type |
Members Only |
Date |
Last modified 2007-03-13 by System |
|
|