Optimization Methods Of Low Voltage Power Networks Development Process
| [View]
[Download]
|
Author(s) |
Anna Mutule, Zigurds Krishans |
Abstract |
Newly built equipment constructions and scheduled
scope of replacement works to be performed are based upon
technical and economic estimations and calculations that create
the background of objective necessity and rational utilization of
financial resources. The major item of the study is optimal initial
states method application opportunities in low voltage networks
development process optimization problems and their solutions.
The development of low voltage network mainly is determined by
the technical criteria. In LV networks, two additional criteria are
applied for limits violation estimation. |