Please enter the words you want to search for:

[Return to folder listing]

   Restoration Of Power System With Predominant Nuclear Power Generation   [View] 
 [Download] 
 Author(s)   V. Azubalis, A. Jonaitis, A. Nargelas, D. Virbickas 
 Abstract   Power system with predominant nuclear power generation restoration after the blackout is analyzed. The system with sufficient thermal power cold reserve could be restored as thermal power system with cold starting of the main part of the units. Power system restoration transients are studied. Maximum power increase rate evaluation and permissible switch on load blocks characteristics estimation is presented. 
 Download 
Filename:A61332
Filesize:235.9 KB
 Type   Members Only 
 Date   Last modified 2006-02-16 by System