|
Operation of the 15 MVA System-Tie Frequency Converter at Nuernberg after relocation
| [View]
[Download]
|
Author(s) |
A. Effenberger; H. Weiss |
Abstract |
In 1994 the first static system tie frequency converter of the German Railways went into operation at
Muldenstein but was relocated to Nuernberg in 1996/1997. It is a 3-level GTO converter capable of
transfering 15MVA rated apparent power from the 50 Hz mains to the 16.7 Hz railway supply line or
into the other direction. Since 1997 this GTO converter is again feeding the local railway supply in a
very demanding operation. Special attention was given to the transient operation e.g. at line short
circuits. Improvements in the control system have been accomplished, a diagnosis system was added. |
Download |
Filename: | EPE2001 - PP00673 - Effenberger.pdf |
Filesize: | 522.9 KB |
|
Type |
Members Only |
Date |
Last modified 2004-03-15 by System |
|
|